With the solar panels installed we are just waiting for a final electrical inspection from our local utility and we can begin producing energy.
The third phase of our installation was to dig a trench from the solar site to our main facility. Conduit was then installed in the trench to run power cables from the solar panels to the building. The trench was then back-filled and on the next warm day was paved over with asphalt.